Section Drawing. Top word: Flow (Bourgeois). Bottom word: Layered (Miyake). Materials: dotted underground walls/floor could be poured concrete; solid layered slabs (underground) could be timber; main structural material for above ground levels could be block concrete. Sketchup model, above ground (word: flow) Sketchup model, underground section (word: layered)
Comments
Post a Comment